Planning a feature stair in an office fitout

A guide from Harbour Steel about straight and feature stairs

Welder in a flipped up helmet walking down a straight plate stringer stair in the workshop

More office fitouts now include a stair between tenancy floors. It gets people moving between teams without the lifts and gives the space a centrepiece. We have built feature stairs for CBRE's Sydney headquarters and Toyota Finance Australia at Grosvenor Place. These are the things that make them go smoothly.

The void comes first

A new stair usually means cutting a new opening in an existing slab. The structural engineer designs the opening and any strengthening, and that design drives everything else about the stair.

Design for the finishes

Decide early on treads, nosings and the balustrade. Stone treads, timber, carpet and glass balustrades all change the steel underneath, and building those details in from the start avoids rework later.

Plan the install around the building

In an occupied building, deliveries, lifts and hot work all need to fit the building manager's rules. Preparing as much as possible in the workshop keeps time on site short.

One contractor for stair and balustrade

Having the stair and balustrade made by the same fabricator means the fixings line up, the finishes match and there is one program to manage.

Got a job like this? See our straight and feature stairs page or send us the drawings.

Send us the drawings

Attach plans, sketches or photos and tell us where the job is. We will look over it and come back to you with a quote.

Workshop: Unit 1, 11-13 Potter Close,
Wetherill Park NSW 2164

How should we get back to you?

What can we help with? (pick any)
Plans or photos (optional)

    Call us Send plans